Proof Status

Current proof and open diligence are separated.

The project is not being presented as finished guest lodging today. Current photos and maps show existing site conditions only. No AI render, QGIS map, or aerial screenshot replaces ground-level silo proof.

Still Haven readiness summary showing secured facts and open diligence.
Current proof summary. It does not imply completed infrastructure, permits, or guest readiness.

What is confirmed, pending, estimated, and next

Proof gap resolved. Ground-level site photography is now complete and published. All photos below are current-condition documentation — not concept renderings or stock imagery.

New

Ground-level silo and property photos.

These photos were taken at the actual Still Haven property. They document the existing silo structures, open pasture, water features, and arrival experience that Phase 1 will build upon.

Two existing steel silo structures in green field at the Still Haven property near Hutto, Texas. Silos on site Both silo structures — Phase 1 conversion targets
Silo structure visible through the mature orchard trees at Still Haven. Silo + orchard Silo through the mature orchard
Still Haven silo structure framed through mature tree canopy. Canopy view Silo through tree canopy
Silo site area showing active build zone at Still Haven. Build zone Silo site area — build zone
Natural water feature at the Still Haven property. Water · Vista Water feature — scenic value zone
Tree-lined rural access route at Still Haven. Site access Tree-lined site access

Public proof today

  • Still Haven LLC active
  • Veteran-owner verification
  • Two-silo Phase 1 scope
  • $95,000 booklet budget
  • Privacy-safe rural Hutto, Texas location framing

Open diligence

  • Land Use Agreement before capital deployment
  • Floodplain/Certificate of Compliance path
  • Licensed OSSF design and Williamson County review
  • Permit review, inspections, and authorization
  • Ground-level silo photo set